leshang
  • HOME
  • Initiator’s Words
    Corporate Information
    Corporate Performance
    Our team
    Contact Us
  • PRODUCTS
    steel roof deck
    steel wall panels
    Steel form decking
    steel floor decking
    sandwich panel for walls
    Sandwich panels for roofing
    Cold Room Panel
    Clean Room Panel System
    Accessories
  • Case Studay
  • Blog
    Boss Diary
    Enterprise Television
  • Free Resources
leshang
Blog

Boss Diary
Enterprise Television

Contact

Shanghai Leshang Building Materials Co., Ltd
Address:Room 103, Jinfeng Building, No. 31 Hengfeng Road, Jing'an District, Shanghai
Phone:86-21-63803633
E-mail:info@solidecking.com
Siteurl:www.steel-deck.com

Current position:Home > Blog> Boss Diary
Boss Diary

Steel deck concrete pouring requirements

1. Before pouring concrete, the sundries on the steel deck (including the magnetic sleeves on the shear nails), dust, grease and other substances that hinder the bonding of concrete must be removed.

2. Before the concrete is poured, in the areas where people and trolleys move frequently on the steel deck, backing plates should be laid to prevent the steel deck from being damaged or deformed, thereby reducing the bearing capacity of the steel deck.

3. When the steel deck bears concrete, the live load is considered to be 150kg/m2. When pouring concrete, care should be taken to avoid excessive concrete accumulation and the impact caused by pouring the concrete. When it is deformed and poured into concrete, it should be dumped at the steel beam as much as possible, and quickly spread out to all sides.

4. After the concrete has been placed, unless the bottom of the steel deck is adequately supported, no other load shall be added to the floor until the concrete reaches 75% of the design ultimate compressive strength.

5. During construction, when the span of the steel beam is greater than the maximum unsupported span of the steel deck, a temporary support shall be provided at the mid-span position, and the temporary support can be removed only after the concrete reaches 75% of the design ultimate compressive strength. , should be carried by pads to avoid concentrated loads, and should be placed above the main load-bearing structural members.

龙华图片.jpg

Contact us

E-mail: info@solidecking.com

tel-phone:86-21-63803633

Address:Room 103, Jinfeng Building, No. 31 Hengfeng Road, Jing'an District, Shanghai

Mobile phone:13816755915 ©2016 Leshang Technologies Co., Ltd.

About US
  • Corporate Information
  • Our team
  • Our advantage
  • Contact Us
Our Services
  • Consultation
  • Design
  • Material Science
Follow Us
Follow  Us  On