leshang
  • HOME
  • Initiator’s Words
    Corporate Information
    Corporate Performance
    Our team
    Contact Us
  • PRODUCTS
    steel roof deck
    steel wall panels
    Steel form decking
    steel floor decking
    sandwich panel for walls
    Sandwich panels for roofing
    Cold Room Panel
    Clean Room Panel System
    Accessories
  • Case Studay
  • Blog
    Boss Diary
    Enterprise Television
  • Free Resources
leshang
Blog

Boss Diary
Enterprise Television

Contact

Shanghai Leshang Building Materials Co., Ltd
Address:Room 103, Jinfeng Building, No. 31 Hengfeng Road, Jing'an District, Shanghai
Phone:86-21-63803633
E-mail:info@solidecking.com
Siteurl:www.steel-deck.com

Current position:Home > Blog> Boss Diary
Boss Diary

Fixing of steel deck

(1) At least one spot welding shall be conducted on the large and small beams passing through the steel deck at each trough;

(2) The overlapping length of steel deck edge plate and edge formwork on the steel beam shall meet the requirements of design specifications;

(3) The spot welding spacing of steel deck and edging plate overlapped laterally on the steel beam shall not be greater than 500mm;

(4) The steel decks are connected and fixed with self tapping screws.


E18C3908-41B9-42F5-8384-3C91117A1614.png56491886-04E0-4C77-B153-2A59FC1D84FE.png

Contact us

E-mail: info@solidecking.com

tel-phone:86-21-63803633

Address:Room 103, Jinfeng Building, No. 31 Hengfeng Road, Jing'an District, Shanghai

Mobile phone:13816755915 ©2016 Leshang Technologies Co., Ltd.

About US
  • Corporate Information
  • Our team
  • Our advantage
  • Contact Us
Our Services
  • Consultation
  • Design
  • Material Science
Follow Us
Follow  Us  On