leshang
  • HOME
  • Initiator’s Words
    Corporate Information
    Corporate Performance
    Our team
    Contact Us
  • PRODUCTS
    steel roof deck
    steel wall panels
    Steel form decking
    steel floor decking
    sandwich panel for walls
    Sandwich panels for roofing
    Cold Room Panel
    Clean Room Panel System
    Accessories
  • Case Studay
  • Blog
    Boss Diary
    Enterprise Television
  • Free Resources
leshang
Free Resources

Contact

Shanghai Leshang Building Materials Co., Ltd
Address:Room 103, Jinfeng Building, No. 31 Hengfeng Road, Jing'an District, Shanghai
Phone:86-21-63803633
E-mail:info@solidecking.com
Siteurl:www.steel-deck.com

Current position:Home > Free Resources
Free Resources

ERECTION of floor deck

ERECTION

 

A. Install deck units and recommendations and final shop drawings, and as specified herein.

B. Place steel decking on structure and adjust to final position before permanently securing thereto. Bring each unit to proper bearing on supporting members. Pack, if required, between supporting steel and steel deck.

C. Align deck end to end to accurately fit with the corresponding sections, with sections parallel, even and straight.

D. After alignment and levelling fasten deck units to structure at ends of units and at intermediate supports.

E. Install necessary angle and channel closure pieces at ends of deck abutting other steel.

F. Attach metal cell closures at locations required to contain poured concrete.

G. Install edge forming for concrete cover slabs.

H. Reinforcement is not required for circular deck openings smaller than 150mm diameter or square deck openings smaller than 150mm x 150mm, provided that not more than two vertical webs are removed.

I. For circular deck openings between 150mm and 300mm diameter, or square deck

openings between 150mm x 150mm and 300mm x 300mm in size, install 50mm x50mm x 6mm steel angles, perpendicular to flutes, welded to 2 flutes each side of opening.

J. For circular deck openings larger than 300mm diameter or square deck openings larger than 300mm x 300mm, separate framing will be supplied under Section Structural Steel.

K. Immediately after decking is permanently secured in place, touch up galvanized surface with primer where damaged.

L. Verify and approve alignment and levels of supporting members before laying deck.

M. Do not proceed with erection until conditions are made satisfactory.


Contact us

E-mail: info@solidecking.com

tel-phone:86-21-63803633

Address:Room 103, Jinfeng Building, No. 31 Hengfeng Road, Jing'an District, Shanghai

Mobile phone:13816755915 ©2016 Leshang Technologies Co., Ltd.

About US
  • Corporate Information
  • Our team
  • Our advantage
  • Contact Us
Our Services
  • Consultation
  • Design
  • Material Science
Follow Us
Follow  Us  On